Forge PlantPrint version
In December 1975, production buildings No. 1, 3, 4 and 5 were put in use as it was planned for the 1st Stage of construction. The 2nd Stage of construction was completed in December 1980 and the operating capacity of the plant was 300 000 forgings/year. Thirty one year has passed since the beginning of the construction. We still adhere to the traditions created by the pioneers in the construction and setting-up of the plant. At present the personnel of the enterprise numbers over 2000 and Gennady S. Logunov acts as the Plant Manager. PRODUCTION FACILITIES - TECHNICAL DATA Type of production (as designed) : mass production
Due to the steep reduction in production in 1997 Building No.2 was moth-balled. In 2009 year 307 rationalization proposals were introduced, the economic effect of which was 1672, 22 thousand rubbles. In 2010 year 221 rationalization proposals were realized; the saving caused by their usage reached 52792,6 thousand rubbles. |
||||||||||||||||||||||||||||
| KAMAZ-Metallurgy Plc (1998-2004). All rights to any materials published on the site are protected by the Russian and International legislation on the copyright and allied rights. For use of information please refer to: | P.O.B. 156, Naberezhnye Chelny 423823, Tatarstan, Russia | e-mail: kamlit@kamlit.ru Phone: 8 (552) 37-35-92 |
Site design: Netkam |